Sub-base and pad for a log store in ME7
A log store is only as dry as the ground under it, and the base beneath it is simple in principle: crushed stone rolled firm, with a slab of concrete on top for the stacked logs to sit on. The quantities are easy to misjudge by eye, because each one depends on the thickness of its layer as much as on the footprint. This guide sets out each layer for a pad of 2.5 metres by 1.9 metres, and works the materials to a single order.
Lakeside BM is the Gillingham and Hempstead delivery site of Discount Builders Merchants (KENT) LTD, the builders' merchant at Lower Road, Northfleet, DA11 9BB. There is one yard, and orders are placed on www.discountbm.co.uk.

Choosing the spot and marking out
Pick a spot that is level, clear of the house wall and within reach of a barrow from the side passage. Keep the pad well away from any tree, because roots push a slab up from underneath over the years, and a pad that lifts leaves a log store leaning. Set out the square with string and pegs, and check that both diagonals match before any ground is opened.
Make the pad about 50 mm larger than the store's frame on every side, so the uprights sit fully on the concrete and rain runs off the edge rather than onto the timber. Measure the store's own base frame when it arrives, because a footprint printed on a box is often a little different from the frame inside it.
Digging out and the type 1 sub-base
Strip the turf and any soft topsoil back to firm ground. Dig about 250 mm below the finished surface, which is 150 mm for the sub-base and 100 mm for the slab on top. Where the ground is made up or full of old brick, dig deeper and take out anything that will settle under the weight of a full stack of logs.
Build the type 1 up in lifts of roughly 75 mm at most, dampening each lift and passing a plate over it before the next one goes on. A deep layer settles unevenly and leaves a dip that shows once the frame is in place. Check the surface with a straight edge, and make up any low corner while the stone is still loose.
Pouring the slab
Fix formwork boards to the outline with pegs, so the top sits level on every side and the edges stay straight. Give the slab a slight fall of a few millimetres per metre towards the open side, so water runs off the front rather than standing under the stacked logs.
The concrete is mixed at about one part cement, two parts sharp sand and four parts 20 mm ballast, by volume, and the cement is counted from the cubic metres the slab takes. Pour the whole slab in a single day, work the surface with a float as it stiffens, and keep it damp under sacking or plastic for several days so it hardens evenly.
Anchoring the frame and the wait
Set the store's post anchors or ground fixings into the wet concrete as it is poured, at each corner and at the middle of each long side, so the frame can be fixed down later without drilling into the slab. Position them with a template cut from the store's base frame, and check the spacing against the holes before the concrete starts to set.
Leave the slab to cure before any weight goes on it. A fresh slab can be marked by frost in its first days, so cover it at night and wait at least a week before the first logs go on. A slab poured in autumn takes longer to gain its strength than one poured in spring, and the wait is longer for it.
Planning, access and the materials
A log store at the back of a garden is usually allowed without planning consent when it stays within the height limits and off the front of the house. A conservation area or an unusual plot can change that, so the council can confirm the position for a particular garden before the pad is dug.
The sub-base and the ballast come in bulk bags of about 0.8 tonnes each, and they should stand on a hard surface at the kerb or on the drive. Tell the yard where the bags can be set down, and whether the route down the side passage is clear of gates and steps, because every bag after that is carried by hand.
Rules of thumb
| Type 1 for the sub-base | Length times width times 0.15 m gives the volume. Multiply by two for tonnes once it is rolled. |
|---|---|
| Slab concrete | Length times width times slab depth, in cubic metres. A 100 mm slab is 0.1 m deep. |
| Cement at the 1:2:4 mix | About twelve 25 kg bags for each cubic metre of concrete. |
| Sharp sand and ballast | About 0.6 tonne of sand and 1.2 tonnes of 20 mm ballast for each cubic metre. |
| Bulk bags | Round each total up to the next bag of about 0.8 tonnes, so the last bag is never short. |
| Base size | The store's footprint plus 50 mm on every side. |
The shop has calculators that turn a measurement into a quantity.
Worked order: A 2.5 by 1.9 metre log store pad in ME7
| Product | Quantity | What it is for | Cost |
|---|---|---|---|
| Bulk Type 1 Roadstone | 2 at £45.83 | The pad is 2.5 m by 1.9 m, which is 4.75 m2. A 150 mm sub-base is 0.71 m3, or about 1.4 tonnes of rolled type 1. Two bulk bags of about 0.8 tonnes each cover it. | £91.66 |
| Bulk Bag Ballast 20mm | 1 at £40.00 | The 100 mm slab is 0.48 m3. At about 1.2 tonnes of 20 mm ballast to each cubic metre, that is 0.57 tonnes, which one bulk bag of about 0.8 tonnes covers. | £40.00 |
| Bulk Sharp Washed Sand | 1 at £40.00 | The same slab takes about 0.6 tonnes of sharp sand to each cubic metre, so 0.29 tonnes. One bulk bag is enough for the mix. | £40.00 |
| 25kg Mastercrete Cement (plastic) | 6 at £7.99 | Twelve bags to each cubic metre at the 1:2:4 mix. The slab is 0.48 m3, which takes about 5.7 bags, so six. | £47.94 |
| Goods | £219.60 | ||
| Delivery to ME7 | £0.00 | ||
| Delivered total ex VAT | £219.60 | ||
| Delivered total inc VAT | £263.52 | ||
Bulk bags: the bags in this order are counted at about 0.8 tonnes each. That is a planning figure. The shop does not publish a weight for a bulk bag, so confirm the number of bags with the yard before ordering.
Not in this order: The formwork boards and pegs, the anchor bolts, a damp-proof membrane if the ground is wet, the sacking for curing, the store's frame and roof, and any paving laid on the finished pad.
The quantities are a starting point for a job of this size. Put the same goods in a basket on www.discountbm.co.uk with your own postcode to see the figure for your order, or send the yard your list.
On the shop today
The products this guide talks about, from the shop's Aggregates aisle. Prices last checked .
-
Bulk Type 1 Roadstone
each
£55.00 inc VAT
£45.83 ex VAT
In the yard
-
Bulk Bag Ballast 20mm
each
£48.00 inc VAT
£40.00 ex VAT
In the yard
-
Bulk Sharp Washed Sand
each
£48.00 inc VAT
£40.00 ex VAT
In the yard
-
Bulk Bag Soft Building Sand Nepicar
each
£55.00 inc VAT
£45.83 ex VAT
In the yard
Prices are the shop's prices today. Stock and ordering are on www.discountbm.co.uk.
Ballast, sand and stone for bases in ME7 See all Aggregates on the shop
Delivery to Gillingham and Hempstead
- ME7
-
Free when the goods reach £41.66 ex VAT (£49.99 inc VAT).
A smaller order pays the difference up to that amount: goods of £25.00 ex VAT (£30.00 inc VAT) pay £16.66 ex VAT (£19.99 inc VAT) for delivery.
More guides for Gillingham and Hempstead
- Stud partition for a garage conversion Studs, plates, noggins and OSB bracing for a 3.6 metre garage partition in ME7, with each length counted and finished as a worked order.
- Brick gate piers beside a side passage Bricks, footings, sand and cement for two 1.5 metre gate piers beside a side passage in ME7, counted course by course to a worked order.
- Stepped fence along a sloping side passage Panels, slotted posts, gravel boards and a gate for a 12.8 metre fence that steps down a sloping passage in ME7, counted to a worked order.